Friday, April 15, 2011

Model Building

Here are a few images of my model building process for Project 4B.

Image 1. Pieces to build "egg-crate" framing for model.
Image 2. Symbols given to bracing/ support pieces to help organize the assembly process.
Image 3. Assembly of profiles and bracing/ support pieces.
Image 4. Assembly of both forms in section.
Image 5. Completed framing system with exterior finishes (wood veneer) applied.
Image 6. Though nothing oggle over, a look at the pool in the sectional model with a slight shadow of the "frit" applied to the glazing.

No comments:

Post a Comment