Saturday, February 5, 2011

Production Progress Report

Exploded view of the main Pivot assembly.




Just updating my progress. Model detailing is 75% finished, with the platform and truss beneth that still yet to be modeled. Render 1 is an isolated view of the pivot connection of the Boom Crane assembly.





Main pivot assembly showing the ball bearings inside.


Assembled pivot assembly with column units in place. (column texture is not final) Still haven't settled on a final one yet, though the shape is staying.







A look at the Boom Crane assembly with the attached ballast tank on end. 2 assemblies come together to form a complete module unit.




A quick render of the stair rotation pivot.







5 comments:

  1. Nice Perry, this looks sick. Can't wait to see the final product.

    ReplyDelete
  2. Thanks bud... my eyes are about ready to pop out of my skull though...

    ReplyDelete
  3. I know what you mean. So how did you do the frame? Wire and then Extrude or some other way..?

    ReplyDelete
  4. A whole lot of piping. and yeah, a whole lot of lines too...

    ReplyDelete